Wednesday 30 October 2013

PURGING OF THE SITE




More Details: http://advocateselvakumar.com

Before Starting any work, generally, the process of cleaning occupies, the priority. Similarly, before starting construction, the construction site should be thoroughly cleaned and prepared for construction. This is called purging of the site from evil effects.
This process requires a well experienced mason, who is as important as engineer. An inexperienced mason with his inefficiency may mar the fortunes of the residents of the proposed house. Many masons have correct understanding of Vaastu, brought by generations. The masons should possess accurate tools to mark the directions and to measure the site. Their important tools, setsquare to fix, correct corners, intermediate directions, and plumb line to ensure perpendicular accuracy of the walls, should be used with diligence. The same tools should be used until the construction is completed, otherwise, there may be differences in areas of the rooms and place in between parallel walls.
Marking directions:
First the mason should identify all the eight directions correctly, which is followed by cleaning, and preparation of plot. The directions, south, west, and southwest must be elevated than east, north, and northeast. Any pits, shallow places, wells in weak or unfavourable positions should be filled up. The surface of the site should be levelled with raise in the directions of south, west and southwest. Avoid sites with anthills.
Levelling and reforming, raising in the site must be done before starting construction, but not after, to avoid evil effects of Vaastu. A well or bore well must be sunk in north east, east or north after the foundation is laid and only its water must be used for construction. At least, a sump must be laid in any of these directions. Do not store, the construction materials like bricks, tiles, wood, steel, stones, lime in north, east or northeast use south, west or southwest for storing them.
Starting of work: Work should ensure that the excavation starts from northeast and proceeds towards north west. Repeat the same process from northeast to southeast and from northwest to southwest. This process should end by excavating the southern side from southeast to southwest. The work of foundation must start from southwest to southeast, southwest to northwest; southeast to northeast and end from northwest to northeast. Similar process is required for wall constructions. Importantly, at the end of any day, the walls at southern and western sides should be higher than the walls at north and eastern sides. The temperature in the locality determines the height of walls; prefer high ceiling if the temperature is high and low ceiling if temperature is low.
Pillars: Pillars should square or cylindrical in shape but pillars at southeast must be invariably square in shape. Main entrance should not face the edge of any wall, pillar, or compound wall. Likewise there should not be any tree, well, sump, pit in front of the main door. The northeast corner of the outer walls, compound wall should never be rounded off, where as it is permitted in other comers. Do not have arches of semicircular shape on gates located on eastern and northern sides, but such semicircular arches are permitted on gates located in south and west.

No comments:

Post a Comment